![](https://www.assystem.com/wp-content/uploads/2022/09/Switch-On-Nos-references-03.jpg)
Our references
We help many industrial players to switch to low-carbon energy, infrastructure and transport.
Major groups already trust us: CEA, EDF, ENEC, Enedis, Engie, Framatome, ITER, K.A. CARE, Naval Group, NICDC, Orano, RATP, Rolls Royce, Royal Commission, Sellafield, SGP, SNCF...
Major groups already trust us: CEA, EDF, ENEC, Enedis, Engie, Framatome, ITER, K.A. CARE, Naval Group, NICDC, Orano, RATP, Rolls Royce, Royal Commission, Sellafield, SGP, SNCF...
-
Design and construction management for a cryogenic plant on ITER site
-
🔗 Grid impact study for the implementation of a 600 MW wind farm
-
Modernisation of electricity networks of a military harbor
-
Feasibility studies for hydrogen fueling of river boats
-
BIM and technical synthesis for the Station F
-
Site surveys for the design of a nuclear power plant